Soil and Enviro IndustriesPrivate Limited
Thermal power plant with cooling tower and stacks

Industries

Power generation

Thermal and captive power plants must meet stringent particulate limits while running continuously at high gas volumes. Soil and Enviro designs new ESPs and bag filters for boilers of every size and is a specialist in upgrading existing precipitators to current norms.

Emission sources we address

From source to stack, across the plant.

  • 01

    Utility thermal units

    ESP upgradation of existing units, including a 210 MW unit.

  • 02

    Captive power plants

    ESPs for coal-, husk- and biomass-fired boilers.

  • 03

    AFBC and CFBC boilers

    Process-matched ESP and bag filter systems.

  • 04

    Biomass power

    ESPs for biomass-fired boilers in India and Southeast Asia.

The challenge

Hard problems, engineered answers.

  1. 01

    Changing coal quality

    Ash content shifts from one shipment to the next.

    Collectors sized with margin for the worst coal.

  2. 02

    High-resistivity fly ash

    Low-sulphur Indian coal ash resists charging.

    More collection area and modern TR sets.

  3. 03

    Light biomass ash

    Husk and biomass ash re-entrains and can carry sparks.

    Low gas velocities and spark-aware layouts.

  4. 04

    Older units, newer limits

    Many ESPs were built for looser norms.

    Retrofits: extra fields, new internals, TR upgrades.

  5. 05

    Load swings and start-ups

    Gas conditions change with boiler load.

    Controls that adapt energisation and cleaning.

  6. 06

    Months between shutdowns

    Boilers run long campaigns without a break.

    AMC and O&M keep collectors in service.

Thermal power limits were tightened by the MoEF&CC notification of December 2015; captive and biomass units follow CPCB and state board limits.

Track record

Trusted by leading names in power generation.

  • Tata Power
  • BALCO
  • Grasim Industries
  • Nahar Group
  • KRBL
  • NTPC
  • DVC
  • CESC
  • WBPDCL
  • Kalpataru Power Transmission
  • MechmarMalaysia

and many more

Proven in the field

  • BALCO (Vedanta Group)ESP revamping for a captive power station, 5,30,000 Am³/hr
  • SAIL, Bhilai Steel PlantESP upgradation, Power & Blowing Station, 3,27,000 Am³/hr
  • Grasim Industries (Aditya Birla Group)Four ESP upgrades across two power plants, up to 2,36,520 Am³/hr
  • Saraff Energies Ltd. (through Bajaj Power & Equipment)ESP for an EFB-fired boiler, 2,32,560 Am³/hr at 180 °C
  • WBPDCL, Kolaghat Thermal Power StationESP upgradation for a 210 MW unit
  • MB Power (Madhya Pradesh)Dust extraction system for a 600 MW power plant

and many more

A full power generation reference list is available on request. View all projects

Plant O&M

Keep boiler ESPs and bag filters within limits, shift after shift.

Explore Plant O&M

Questions we are often asked

Power generation: frequently asked questions.

Can an existing boiler ESP meet tighter limits?

Usually, yes: with an extra field, new internals and modern TR sets, as at BALCO, Grasim and WBPDCL.

ESP or bag filter for a biomass boiler?

Both are used. The choice depends on the fuel, the ash and the emission limit; we base it on your boiler data.

Do you upgrade ESPs of other makes?

Yes, including Thermax, Kirloskar and Peabody Stewart units.

Can the work fit a boiler shutdown?

Yes. Parts are made in-house and ready before the outage.

Planning a system for your power plant?

Send us the emission source, gas conditions and the limit to be met, and we will propose a system sized for your plant.

Call Request a quote